Project Completion Certificate (Ground Water)
Scheme ID: 20026210 Name of Scheme: YUSUFPUR ISHAPUR PWS SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3075 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-Aug-2023 Actual Date of Completion (Capex): 31-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.9m/92.52m Yusufpur Ishapur 28.7839953 77.6488313
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 450LPM/55M Yusufpur Ishapur 28.7839953 77.6488313
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125 KL/16M Yusufpur Ishapur 28.7839953 77.6488313
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 100 .021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.556
2 HDPE 75 .264
3 HDPE 90 .503
4 HDPE 110 .066
5 HDPE 140 .182
HSC Connection
Sno. Total Nos.
1 421
Other Details
1.57
1.55
1.55
28-Feb-2025
01-Mar-2025