Scheme ID: 20026234 Name of Scheme: DINGURPUR ELAQUA SAHERAMAU No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 2980 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.00/95.27 DINGURPUR ELAQUA SAHERAMAU 27.73125 79.978077
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 39 M3 / 45M DINGURPUR ELAQUA SAHERAMAU 27.73125 79.978077
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT- 1 175 KL -16 M DINGURPUR ELAQUA SAHERAMAU 27.73150 79.978065
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI -K7 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 2.885
2 HDPE / 6KG 75 1.382
3 HDPE / 6KG 90 1.636
4 HDPE / 6KG 110 1.956
5 HDPE / 6KG 140 0.737
6 HDPE / 6KG 160 0.536
HSC Connection
Sno. Total Nos.
1 453
Other Details
2.11
0.00
2.11
30-Dec-2023
06-Dec-2024