| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026243 | Name of Scheme: JAMAUR | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 4220 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 20-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 30.00/93.00 | JAMAUR | 27.842988 | 79.847961 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP- | 56.40M3/41M | JAMAUR | 27.842988 | 79.847961 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 300KL-12M | JAMAUR | 27.842895 | 79.848048 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 150 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/6KG | 63 | 5.349 | |
| 2 | HDPE/6KG | 75 | 0.783 | |
| 3 | HDPE/6KG | 90 | 0.815 | |
| 4 | HDPE/6KG | 110 | 0.059 | |
| 5 | HDPE/6KG | 140 | 0.351 | |
| 6 | HDPE/6KG | 160 | 0.079 | |
| 7 | HDPE/6KG | 180 | 0.093 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 718 |