| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026263 | Name of Scheme: BASOHANI | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 3755 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 25-Mar-2024 | Actual Date of Completion (Capex): 26-Aug-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200x300 mm tubewell | 120.81 | Basohani | 26.001578 | 80.865605 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 25 HP | 800/60 | Basohani | 26.001578 | 80.865605 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 225/16 | Basohani | 26.001497 | 80.86552 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE 100 MM K-7 | 100 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 200 | 458 | |
| 2 | HDPE PIPE | 180 | 373 | |
| 3 | HDPE PIPE | 160 | 1209 | |
| 4 | HDPE PIPE | 125 | 240.50 | |
| 5 | HDPE PIPE | 110 | 832 | |
| 6 | HDPE PIPE | 90 | 225 | |
| 7 | HDPE PIPE | 75 | 328 | |
| 8 | HDPE PIPE | 63 | 5353 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 861 |