Project Completion Certificate (Ground Water)
Scheme ID: 20026263 Name of Scheme: BASOHANI No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3755 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Mar-2024 Actual Date of Completion (Capex): 26-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200x300 mm tubewell 120.81 Basohani 26.001578 80.865605
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 25 HP 800/60 Basohani 26.001578 80.865605
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 225/16 Basohani 26.001497 80.86552
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 MM K-7 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 200 458
2 HDPE PIPE 180 373
3 HDPE PIPE 160 1209
4 HDPE PIPE 125 240.50
5 HDPE PIPE 110 832
6 HDPE PIPE 90 225
7 HDPE PIPE 75 328
8 HDPE PIPE 63 5353
HSC Connection
Sno. Total Nos.
1 861
Other Details
2.48
2.53
2.53
26-Nov-2023
27-Nov-2023