| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026279 | Name of Scheme: KODARPUR | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 1890 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 29-Mar-2024 | Actual Date of Completion (Capex): 22-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150X200 MM TUBEWELL | 160.86 | KODARPUR | 25.8764 | 80.949425 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP | 400/60 | KODARPUR | 25.8764 | 80.949425 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 125/14 | KODARPUR | 25.875947 | 80.949037 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE 80MM K-9 | 80 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 160 | 46 | |
| 2 | HDPE PIPE | 110 | 1103 | |
| 3 | HDPE PIPE | 90 | 1126 | |
| 4 | HDPE PIPE | 75 | 1379 | |
| 5 | HDPE PIPE | 63 | 2664.50 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 372 |