Project Completion Certificate (Ground Water)
Scheme ID: 20026302 Name of Scheme: BAN No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 4432 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Sep-2023 Actual Date of Completion (Capex): 23-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 1 30.12/157.95 BAN 26.581793 79.646526
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 JASCO 950/65 BAN 26.581793 79.646526
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275/18 BAN 26.581793 79.646526
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.351
2 HDPE 90 0.238
3 HDPE 110 0.549
4 HDPE 125 0.41
5 HDPE 140 1.281
6 HDPE 160 0.256
7 HDPE 180 0.259
8 HDPE 200 0.251
HSC Connection
Sno. Total Nos.
1 765
Other Details
4.15
4.02
2.71
23-Mar-2024
30-Nov-2024