Project Completion Certificate (Ground Water)
Scheme ID: 20026303 Name of Scheme: PARSOLI & BHUJPURA No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 3674 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Sep-2023 Actual Date of Completion (Capex): 08-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/140.37 PARSOLI & BHUJPURA 26.458716 80.041592
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 950/64 PARSOLI & BHUJPURA 26.458716 80.041592
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275/18 PARSOLI & BHUJPURA 26.458716 80.041592
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.0125
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.438
2 HDPE 90 2.318
3 HDPE 110 1.076
4 HDPE 140 1.521
5 HDPE 160 0.758
6 HDPE 180 0.511
7 HDPE 200 0.916
HSC Connection
Sno. Total Nos.
1 745
Other Details
4.35
0.00
3.61
22-Mar-2024
23-Mar-2024