| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026313 | Name of Scheme: Bharaipur PWS | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 2715 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 20-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 24.07/151.29 | Bharaipur | 26.687268 | 79.228108 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 36(M³/Hr.)/49Mtr. | Bharaipur | 26.687268 | 79.228108 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175/16 | Bharaipur | 26.687268 | 79.228108 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 150 | 0.0243 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.747 | |
| 2 | HDPE | 75 | 1.894 | |
| 3 | HDPE | 90 | 0.893 | |
| 4 | HDPE | 110 | 0.644 | |
| 5 | HDPE | 140 | 0.439 | |
| 6 | HDPE | 160 | 0.588 | |
| 7 | HDPE | 180 | 0.988 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 550 |