| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026397 | Name of Scheme: Keshra Water Supply Scheme | No. of Villages: 2 | No. of Habitation Covered: 4 |
| Total Population Covered: 3398 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 12-Mar-2024 | Actual Date of Completion (Capex): 29-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 29.94 / 118.02 | Kesra | 27.43185728 | 80.6337916 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump-1 | 800 / 45 | Kesra | 27.43185728 | 80.6337916 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225 / 15 | Kesra | 27.43185728 | 80.6337916 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 125 | 0.020 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe | 63 | 6.032 | |
| 2 | HDPE Pipe | 90 | 1.318 | |
| 3 | HDPE Pipe | 110 | 0.437 | |
| 4 | HDPE Pipe | 140 | 0.267 | |
| 5 | HDPE Pipe | 160 | 0.191 | |
| 6 | HDPE Pipe | 200 | 2.746 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 632 |