Scheme ID: 20026548 Name of Scheme: NAWADA ISHAWARI SINGH No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 3130 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Oct-2023 Actual Date of Completion (Capex): 14-Jun-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300X300 9.05 M/52.14 M NAWADA ISHAWARI SINGH 25.825687 82.613075
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP 700 LPM/43M NAWADA ISHAWARI SINGH 25.825687 82.613075
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL /12 M NAWADA ISHAWARI SINGH 25.825881 82.612686
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.432 YES
2 HDPE 75 4.265 YES
3 HDPE 63 5.909 YES
4 HDPE 110 1.686 YES
5 HDPE 140 0.509 YES
6 HDPE 160 0.433 YES
7 HDPE 180 0.596 YES
8 HDPE 200 0.693 YES
HSC Connection
Sno. Total Nos.
1 375
Other Details