| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026548 | Name of Scheme: NAWADA ISHAWARI SINGH | No. of Villages: 2 | No. of Habitation Covered: 6 |
| Total Population Covered: 3130 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 03-Oct-2023 | Actual Date of Completion (Capex): 14-Jun-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300X300 | 9.05 M/52.14 M | NAWADA ISHAWARI SINGH | 25.825687 | 82.613075 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP | 700 LPM/43M | NAWADA ISHAWARI SINGH | 25.825687 | 82.613075 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL /12 M | NAWADA ISHAWARI SINGH | 25.825881 | 82.612686 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 2.432 | YES |
| 2 | HDPE | 75 | 4.265 | YES |
| 3 | HDPE | 63 | 5.909 | YES |
| 4 | HDPE | 110 | 1.686 | YES |
| 5 | HDPE | 140 | 0.509 | YES |
| 6 | HDPE | 160 | 0.433 | YES |
| 7 | HDPE | 180 | 0.596 | YES |
| 8 | HDPE | 200 | 0.693 | YES |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 375 |