Project Completion Certificate (Ground Water)
Scheme ID: 20026577 Name of Scheme: MAKANPUR No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 5670 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Mar-2024 Actual Date of Completion (Capex): 18-Jul-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200X300 MM TUBEWELL 1 121.35 MAKANPUR 25.933632 80.945087
2 200X300 MM TUBEWELL 2 143.3 MAKANPUR 25.933887 80.947178
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP (02 NOS) 600/60 MAKANPUR 25.933632, 25.933887 80.945087, 80.947178
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 350/14 MAKANPUR 25.927847 80.95723
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 125MM K-9 125 0.69
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 200 1009
2 HDPE PIPE 180 1332
3 HDPE PIPE 140 1181
4 HDPE PIPE 125 41
5 HDPE PIPE 110 693.50
6 HDPE PIPE 90 209.50
7 HDPE PIPE 75 611
8 HDPE PIPE 63 8599
HSC Connection
Sno. Total Nos.
1 1115
Other Details
3.67
3.73
3.73
18-Oct-2023
19-Oct-2023