| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026584 | Name of Scheme: BAMHRAOULI | No. of Villages: 4 | No. of Habitation Covered: 4 |
| Total Population Covered: 3110 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 29-Mar-2024 | Actual Date of Completion (Capex): 30-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200x300 mm tubewell | 130.02 | bamhraulli | 25.92466 | 80.925522 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 17.5 HP | 650/60 | bamhraulli | 25.92466 | 80.925522 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 175/16 | bamhraulli | 25.92459 | 80.92546 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE 125MM K-9 | 125 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 160 | 263 | |
| 2 | HDPE PIPE | 140 | 1010 | |
| 3 | HDPE PIPE | 125 | 117 | |
| 4 | HDPE PIPE | 110 | 677 | |
| 5 | HDPE PIPE | 90 | 2309.50 | |
| 6 | HDPE PIPE | 75 | 1851 | |
| 7 | HDPE PIPE | 63 | 4739 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 735 |