Project Completion Certificate (Ground Water)
Scheme ID: 20026697 Name of Scheme: PAHARDPUR No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2610 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Jun-2025 Actual Date of Completion (Capex): 17-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 550LPM 24.02(m)/113.92(m) Nandlalpur 25.840658 80.744301
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible 15HP 550 LPM/60M Nandlalpur 25.840658 80.744301
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL/14 M Nandlalpur 25.840658 80.744301
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.036
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe 63 3.6299
2 HDPE Pipe 75 1.4743
3 HDPE Pipe 90 0.415
4 HDPE Pipe 110 0.1391
5 HDPE Pipe 125 0.9995
6 HDPE Pipe 140 0.0307
7 HDPE Pipe 160 1.258
8 HDPE Pipe 180 0.042
HSC Connection
Sno. Total Nos.
1 485
Other Details
2.42
0.00
2.38
17-Sep-2024
18-Sep-2024