Project Completion Certificate (Ground Water)
Scheme ID: 20028071 Name of Scheme: SINGAHI DEHAT JJM SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2172 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Apr-2024 Actual Date of Completion (Capex): 18-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/110 SINGAHI DEHAT 28.299278 80.926131
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 500/43 SINGAHI DEHAT 28.300106 80.900552
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/16 SINGAHI DEHAT 28.299277 80.926129
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe 100 0.01680
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe 63 6.875
2 HDPE Pipe 75 1.827
3 HDPE Pipe 90 0.575
4 HDPE Pipe 110 3.613
5 HDPE Pipe 140 0.648
HSC Connection
Sno. Total Nos.
1 330
Other Details
1.81
0.00
2.03
17-Jan-2025
18-Jan-2025