Project Completion Certificate (Ground Water)
Scheme ID: 20029752 Name of Scheme: AIHAR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 7150 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 18-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.01/132.96 Aihar 26.721042 81.800581
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 13900 LPM /45 Mtr Aihar 26.721042 81.800581
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 400/16 Aihar 26.720992 81.800451
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.01665
2 HDPE Pipe PN-6: Class PE - 100 63 12.7412
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE - 100 200 1.1121
2 HDPE Pipe PN-6: Class PE - 100 180 0.1241
3 HDPE Pipe PN-6: Class PE - 100 160 0.0756
4 HDPE Pipe PN-6: Class PE - 100 140 1.2474
5 HDPE Pipe PN-6: Class PE - 100 125 0.1017
6 HDPE Pipe PN-6: Class PE - 100 110 1.5631
7 HDPE Pipe PN-6: Class PE - 100 90 1.2979
8 HDPE Pipe PN-6: Class PE - 100 75 2.6923
HSC Connection
Sno. Total Nos.
1 1089
Other Details
4.79
0.00
5.80
18-Feb-2024
15-Nov-2024