Project Completion Certificate (Ground Water)
Scheme ID: 20029767 Name of Scheme: Bewada WS No. of Villages: 2 No. of Habitation Covered: 389
Total Population Covered: 2450 Base Year: 2022 Intermediate Year: 2027 Design Year: 2032
Date of Completion (As per Contract): 17-Dec-2024 Actual Date of Completion (Capex): 17-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Strainer 24 Bewada WS 25.434694 83.412824
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 550/14 Bewada WS 25.434694 83.412824
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 service reservoir 150/14 Bewada WS 25.434694 83.412824
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.741
2 HDPE 75 2.091
3 HDPE 63 5.548
4 HDPE 110 1.49
5 HDPE 125 1.043
6 HDPE 140 0.447
7 HDPE 160 0.4458
8 HDPE 180 0.023
HSC Connection
Sno. Total Nos.
1 389
Other Details
2.44
2.44
2.44
17-Dec-2024
18-Dec-2024