Project Completion Certificate (Ground Water)
Scheme ID: 20029776 Name of Scheme: Jamurana WS No. of Villages: 2 No. of Habitation Covered: 399
Total Population Covered: 3213 Base Year: 2022 Intermediate Year: 2027 Design Year: 2032
Date of Completion (As per Contract): 17-Dec-2024 Actual Date of Completion (Capex): 17-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Strainer 22 Jamurana 25.413334 83.282389
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 650/14 Jamurana 25.413334 83.282389
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 service reservoir 200/14 Jamurana 25.413334 83.282389
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 125 0.045
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.854
2 HDPE 75 4.714
3 HDPE 63 11.334
4 HDPE 110 0.238
5 HDPE 125 0.53
6 HDPE 140 0.118
7 HDPE 160 0.019
HSC Connection
Sno. Total Nos.
Other Details
2.76
2.76
2.76
17-Dec-2024
18-Dec-2024