| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20030018 | Name of Scheme: AKHTIYAR PUR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 4370 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 12-Oct-2023 | Actual Date of Completion (Capex): 03-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21.01/132.40 | AKHTIYARPUR | 26.784939 | 81.783217 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP | 730LPM/40Mtr | AKHTIYARPUR | 26.784939 | 81.783217 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225/14 | AKHTIYARPUR | 26.784939 | 81.783217 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 125 | 0.017 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 200 | 0.0000 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 180 | 0.5480 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 160 | 0.7025 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 140 | 1.7973 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 125 | 2.5712 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 110 | 1.5322 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 90 | 1.0179 | |
| 8 | HDPE Pipe PN-6: Class PE-100 | 75 | 0.6788 | |
| 9 | HDPE Pipe PN-6: Class PE-100 | 63 | 5.9218 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 650 |