Project Completion Certificate (Ground Water)
Scheme ID: 20030032 Name of Scheme: MAHMUD MAU GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2779 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 13-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.00/123.00 Mahmudmau 26.691841 81.66677
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 580 LPM / 40 Mtr Mahmudmau 26.691841 81.66677
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/12 Mahmudmau 26.691669 81.666686
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.0141
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE -100 200 0.0231
2 HDPE Pipe PN-6: Class PE -100 180 0.2887
3 HDPE Pipe PN-6: Class PE -100 160 0.1302
4 HDPE Pipe PN-6: Class PE -100 140 1.4634
5 HDPE Pipe PN-6: Class PE -100 125 0.9755
6 HDPE Pipe PN-6: Class PE -100 110 0.9755
7 HDPE Pipe PN-6: Class PE -100 90 0.5532
8 HDPE Pipe PN-6: Class PE -100 75 0.5210
9 HDPE Pipe PN-6: Class PE -100 63 5.2755
HSC Connection
Sno. Total Nos.
1 569
Other Details
2.33
0.00
2.76
13-Oct-2023
15-Nov-2024