Project Completion Certificate (Ground Water)
Scheme ID: 20030048 Name of Scheme: TALAGAON GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3210 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 11-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.00/118.50 Talagon 26.696857 81.640448
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 640 LPM / 40 Mtr Talagon 26.696857 81.640448
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/12 Talagon 26.696857 81.640374
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 125 0.0224
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE -100 200 0.0000
2 HDPE Pipe PN-6: Class PE -100 180 0.0288
3 HDPE Pipe PN-6: Class PE -100 160 0.6631
4 HDPE Pipe PN-6: Class PE -100 140 0.0456
5 HDPE Pipe PN-6: Class PE -100 125 0.1397
6 HDPE Pipe PN-6: Class PE -100 110 0.2720
7 HDPE Pipe PN-6: Class PE -100 90 0.1773
8 HDPE Pipe PN-6: Class PE -100 75 0.4502
9 HDPE Pipe PN-6: Class PE -100 63 6.5640
HSC Connection
Sno. Total Nos.
1 582
Other Details
2.23
0.00
2.69
11-Sep-2023
15-Nov-2024