Project Completion Certificate (Ground Water)
Scheme ID: 20030102 Name of Scheme: HARIHARPUR BALIYA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3950 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 05-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.00/90.42 Hariharpur Baliya 26.732422 81.814191
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 840 LPM/40 Mtr Hariharpur Baliya 26.732422 81.814191
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/14 Hariharpur Baliya 26.73231 81.814384
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 125 0.0167
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE -100 200 0.3880
2 HDPE Pipe PN-6: Class PE -100 180 0.9430
3 HDPE Pipe PN-6: Class PE -100 160 0.3600
4 HDPE Pipe PN-6: Class PE -100 140 0.0830
5 HDPE Pipe PN-6: Class PE -100 125 0.4330
6 HDPE Pipe PN-6: Class PE -100 110 0.5910
7 HDPE Pipe PN-6: Class PE -100 90 0.4380
8 HDPE Pipe PN-6: Class PE -100 75 1.0425
9 HDPE Pipe PN-6: Class PE -100 63 8.5817
HSC Connection
Sno. Total Nos.
1 625
Other Details
3.06
0.00
3.68
05-Oct-2023
15-Nov-2024