Project Completion Certificate (Ground Water)
Scheme ID: 20030225 Name of Scheme: SEEWAN GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2640 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 11-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 23.93/122.13 SEEWAN 26.827786 81.675844
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PIMP 510LPM/40Mtr SEEWAN 26.827786 81.675844
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 SEEWAN 26.827698 81.675732
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.0000
2 HDPE Pipe PN-6: Class PE-100 180 0.0000
3 HDPE Pipe PN-6: Class PE-100 160 0.0291
4 HDPE Pipe PN-6: Class PE-100 140 0.0000
5 HDPE Pipe PN-6: Class PE-100 125 0.4139
6 HDPE Pipe PN-6: Class PE-100 110 0.0000
7 HDPE Pipe PN-6: Class PE-100 90 0.7932
8 HDPE Pipe PN-6: Class PE-100 75 0.7405
9 HDPE Pipe PN-6: Class PE-100 63 5.0444
HSC Connection
Sno. Total Nos.
1 536
Other Details
1.83
0.00
1.88
11-Dec-2023
30-Nov-2024