Project Completion Certificate (Ground Water)
Scheme ID: 20030285 Name of Scheme: BABHANIYAVAN GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2130 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 16-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.00/107.06 BABHANIYAWA 26.727503 81.916346
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 430LPM/40Mtr BABHANIYAWA 26.727503 81.916346
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/12 BABHANIYAWA 26.727544 81.916508
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.0283
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.0000
2 HDPE Pipe PN-6: Class PE-100 180 0.0000
3 HDPE Pipe PN-6: Class PE-100 160 0.0247
4 HDPE Pipe PN-6: Class PE-100 140 0.1139
5 HDPE Pipe PN-6: Class PE-100 125 0.0000
6 HDPE Pipe PN-6: Class PE-100 110 0.4583
7 HDPE Pipe PN-6: Class PE-100 90 0.4533
8 HDPE Pipe PN-6: Class PE-100 75 0.6009
9 HDPE Pipe PN-6: Class PE-100 63 4.1301
HSC Connection
Sno. Total Nos.
1 449
Other Details
1.69
0.00
2.05
16-Feb-2024
30-Nov-2024