Project Completion Certificate (Ground Water)
Scheme ID: 20030304 Name of Scheme: MAJNAWA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 5210 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 13-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.00/97.80 MAJNAWA 26.692613 81.953414
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 1047LPM/45Mtr MAJNAWA 26.692613 81.953414
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300/16 MAJNAWA 26.692728 81.953657
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.0266
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 1.7600
2 HDPE Pipe PN-6: Class PE-100 180 0.000
3 HDPE Pipe PN-6: Class PE-100 160 0.1719
4 HDPE Pipe PN-6: Class PE-100 140 0.0827
5 HDPE Pipe PN-6: Class PE-100 125 0.3670
6 HDPE Pipe PN-6: Class PE-100 110 1.9678
7 HDPE Pipe PN-6: Class PE-100 90 1.4134
8 HDPE Pipe PN-6: Class PE-100 75 0.6872
9 HDPE Pipe PN-6: Class PE-100 63 9.1970
HSC Connection
Sno. Total Nos.
Other Details
3.78
0.00
4.57
13-Jan-2024
01-Feb-2025