Project Completion Certificate (Ground Water)
Scheme ID: 20030434 Name of Scheme: NEOTI & KOPAKANP GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 3404 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 17-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.11/128.25 Neoti 26.751597 81.802183
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 730 LPM / 40 Mtr Neoti 26.751597 81.802183
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/14 Neoti 26.751463 81.802159
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 125 0.0124
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE -100 200 0.9797
2 HDPE Pipe PN-6: Class PE -100 180 0.4040
3 HDPE Pipe PN-6: Class PE -100 160 1.3663
4 HDPE Pipe PN-6: Class PE -100 140 0.0633
5 HDPE Pipe PN-6: Class PE -100 125 0.1178
6 HDPE Pipe PN-6: Class PE -100 110 0.2739
7 HDPE Pipe PN-6: Class PE -100 90 0.9690
8 HDPE Pipe PN-6: Class PE -100 75 2.1227
9 HDPE Pipe PN-6: Class PE -100 63 6.1484
HSC Connection
Sno. Total Nos.
1 579
Other Details
2.84
0.00
3.42
17-Oct-2023
15-Nov-2024