Project Completion Certificate (Ground Water)
Scheme ID: 20030438 Name of Scheme: BANMAU & MIRMAU GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 5710 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 15-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 34.00/114.50 BANMAU 26.713505 81.698991
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 1200LPM/45Mtr BANMAU 26.713505 81.698991
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350/18 BANMAU 26.713573 81.698827
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.012
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 2.5663
2 HDPE Pipe PN-6: Class PE-100 180 1.1867
3 HDPE Pipe PN-6: Class PE-100 160 0.3334
4 HDPE Pipe PN-6: Class PE-100 140 0.1528
5 HDPE Pipe PN-6: Class PE-100 125 0.1370
6 HDPE Pipe PN-6: Class PE-100 110 0.7550
7 HDPE Pipe PN-6: Class PE-100 90 1.7951
8 HDPE Pipe PN-6: Class PE-100 75 1.2641
9 HDPE Pipe PN-6: Class PE-100 63 18.7702
HSC Connection
Sno. Total Nos.
1 1310
Other Details
4.75
0.00
5.74
15-Mar-2024
30-Nov-2024