Project Completion Certificate (Ground Water)
Scheme ID: 20030453 Name of Scheme: BARELA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 3550 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 08-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.04/122.96 BARELA 26.711604 81.670458
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 610LPM/40Mtr BARELA 26.711604 81.670458
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/12 BARELA 26.711612 81.670301
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 125 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.3846
2 HDPE Pipe PN-6: Class PE-100 180 0.8680
3 HDPE Pipe PN-6: Class PE-100 160 1.8900
4 HDPE Pipe PN-6: Class PE-100 140 0.0000
5 HDPE Pipe PN-6: Class PE-100 125 0.0313
6 HDPE Pipe PN-6: Class PE-100 110 1.1209
7 HDPE Pipe PN-6: Class PE-100 90 0.3915
8 HDPE Pipe PN-6: Class PE-100 75 1.3279
9 HDPE Pipe PN-6: Class PE-100 63 7.9385
HSC Connection
Sno. Total Nos.
1 540
Other Details
2.49
0.00
2.99
08-Mar-2024
30-Nov-2024