Project Completion Certificate (Ground Water)
Scheme ID: 20030477 Name of Scheme: FIROZPUR MAKHDOOMI GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 17
Total Population Covered: 8360 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 26-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL -1 24.00/126.00 FIROZPUR MAKDOOMI 26.708091 81.726361
2 TUBEWELL -2 21.00/106.00 FIROZPUR MAKDOOMI 26.71036 81.72742
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP -1 860LPM/45Mtr FIROZPUR MAKDOOMI 26.708091 81.726361
2 VT PUMP -2 860LPM/45Mtr FIROZPUR MAKDOOMI 26.71036 81.72742
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 500/16 FIROZPUR MAKDOOMI 26.708182 81.726534
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 200 0.03
2 DI K-7 125 0.482
3 DI K-7 100 0.091
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.2165
2 HDPE Pipe PN-6: Class PE-100 180 1.5980
3 HDPE Pipe PN-6: Class PE-100 160 3.0816
4 HDPE Pipe PN-6: Class PE-100 140 0.7356
5 HDPE Pipe PN-6: Class PE-100 125 0.5864
6 HDPE Pipe PN-6: Class PE-100 110 2.1442
7 HDPE Pipe PN-6: Class PE-100 90 3.8808
8 HDPE Pipe PN-6: Class PE-100 75 4.7902
9 HDPE Pipe PN-6: Class PE-100 63 18.2398
HSC Connection
Sno. Total Nos.
1 1443
Other Details
6.62
0.00
7.83
26-Dec-2023
01-Feb-2025