Project Completion Certificate (Ground Water)
Scheme ID: 20030511 Name of Scheme: BIRHARA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 2670 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 01-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 22.00/122.50 Birhara 26.714443 81.771766
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 550LPM/40Mtr Birhara 26.714443 81.771766
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 Birhara 26.714339 81.771641
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.0195
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.0000
2 HDPE Pipe PN-6: Class PE-100 180 0.0000
3 HDPE Pipe PN-6: Class PE-100 160 0.3255
4 HDPE Pipe PN-6: Class PE-100 140 0.1535
5 HDPE Pipe PN-6: Class PE-100 125 0.3258
6 HDPE Pipe PN-6: Class PE-100 110 0.7369
7 HDPE Pipe PN-6: Class PE-100 90 0.2589
8 HDPE Pipe PN-6: Class PE-100 75 1.0428
9 HDPE Pipe PN-6: Class PE-100 63 6.7291
HSC Connection
Sno. Total Nos.
1 464
Other Details
2.11
0.00
2.56
01-Dec-2023
30-Nov-2024