Project Completion Certificate (Ground Water)
Scheme ID: 20030555 Name of Scheme: PASTAMAPHI GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2590 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 29-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.05/126.45 Pastamaphi 26.832106 81.79718
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 520 LPM/40 Mtr Pastamaphi 26.832106 81.79718
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 Pastamaphi 26.831909 81.79729
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.0305
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE -100 200 0.0000
2 HDPE Pipe PN-6: Class PE -100 180 0.4516
3 HDPE Pipe PN-6: Class PE -100 160 0.2524
4 HDPE Pipe PN-6: Class PE -100 140 0.2812
5 HDPE Pipe PN-6: Class PE -100 125 0.0000
6 HDPE Pipe PN-6: Class PE -100 110 0.7618
7 HDPE Pipe PN-6: Class PE -100 90 0.6140
8 HDPE Pipe PN-6: Class PE -100 75 0.5024
9 HDPE Pipe PN-6: Class PE -100 63 3.9487
HSC Connection
Sno. Total Nos.
1 428
Other Details
1.90
0.00
2.30
29-Aug-2023
15-Nov-2024