Project Completion Certificate (Ground Water)
Scheme ID: 20030805 Name of Scheme: Mahuri Kalan Water Supply Schemes No. of Villages: 2 No. of Habitation Covered: 686
Total Population Covered: 4529 Base Year: 2022 Intermediate Year: 2027 Design Year: 2032
Date of Completion (As per Contract): 17-Aug-2024 Actual Date of Completion (Capex): 17-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Strainer 36 Mahuri Kalan 25.435652 83.164837
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 950/16 Mahuri Kalan 25.435652 83.164837
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 service reservoir 300/16 Mahuri Kalan 25.435652 83.164837
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 125 0.045
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.177
2 HDPE 75 7.498
3 HDPE 63 12.548
4 HDPE 110 0.694
5 HDPE 125 0.441
6 HDPE 140 0.194
7 HDPE 160 0.94
8 HDPE 180 0.279
HSC Connection
Sno. Total Nos.
1 686
Other Details
4.16
4.16
4.16
17-Aug-2024
18-Aug-2024