Project Completion Certificate (Ground Water)
Scheme ID: 20031423 Name of Scheme: KOT DEEH SARAIYAN & SARANGAPUR GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 17
Total Population Covered: 8140 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 30-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL -1 27.00/124.50 SARANGAPUR 26.740214 81.853311
2 TUBEWELL -2 24.00/112.47 SARANGAPUR 26.739779 81.852187
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP -1 845LPM/45Mtr SARANGAPUR 26.740214 81.853311
2 VT PUMP -2 845LPM/45Mtr SARANGAPUR 26.739779 81.852187
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OTH -1 500/16 SARANGAPUR 26.740034 81.853321
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 200 0.0112
2 DI K-7 150 0.0155
3 DI K-7 125 0.18
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.1590
2 HDPE Pipe PN-6: Class PE-100 180 0.9648
3 HDPE Pipe PN-6: Class PE-100 160 1.2190
4 HDPE Pipe PN-6: Class PE-100 140 1.6769
5 HDPE Pipe PN-6: Class PE-100 125 1.2270
6 HDPE Pipe PN-6: Class PE-100 110 2.6732
7 HDPE Pipe PN-6: Class PE-100 90 2.3348
8 HDPE Pipe PN-6: Class PE-100 75 3.7137
9 HDPE Pipe PN-6: Class PE-100 63 17.9424
HSC Connection
Sno. Total Nos.
1 1442
Other Details
6.61
0.00
8.00
30-Jun-2024
10-Feb-2025