Project Completion Certificate (Ground Water)
Scheme ID: 20031465 Name of Scheme: Silhaula Buzurg No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2550 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Sep-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.20 As per site
2 HDPE 75 1.528 As per site
3 HDPE 90 1.250 As per site
4 HDPE 110 0.670 As per site
5 HDPE 140 1.270 As per site
6 HDPE 160 1.230 As per site
7 HDPE 180 0.500 As per site
HSC Connection
Sno. Total Nos.
Other Details
1.95
2.33
2.33
19-Aug-2023
20-Aug-2023