Project Completion Certificate (Ground Water)
Scheme ID: 20031467 Name of Scheme: Niwada deoray No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2580 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Sep-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 17/279.54 Niwada Deoray 26.631621 79.97187
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 47.50/57 Niwada Deoray 26.631621 79.97187
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 Niwada Deoray 26.631621 79.97187
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.019 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.60 As per Site
2 HDPE 75 0.70 As per Site
3 HDPE 90 0.230 As per Site
4 HDPE 110 0.065 As per Site
5 HDPE 140 0.440 As per Site
6 HDPE 160 0.056 As per Site
HSC Connection
Sno. Total Nos.
1 350
Other Details
1.90
1.90
1.90
31-Dec-2023
01-Jan-2024