Project Completion Certificate (Ground Water)
Scheme ID: 20031468 Name of Scheme: Rastpur No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 5150 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 31-Mar-2027
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18/67.5 Rastpur 26.51447 80.139648
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 81.5/59 Rastpur 26.51447 80.139648
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300/14 Rastpur 26.51447 80.139648
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.026
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.95
2 HDPE 75 1.47
3 HDPE 90 0.584
4 HDPE 110 0.495
5 HDPE 125 0.448
6 HDPE 140 0.000
7 HDPE 160 0.407
8 HDPE 180 0.018
HSC Connection
Sno. Total Nos.
1 897
Other Details
2.50
2.68
2.68
02-Apr-2024
03-Apr-2024