| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20031468 | Name of Scheme: Rastpur | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 5150 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 31-Mar-2027 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 18/67.5 | Rastpur | 26.51447 | 80.139648 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 81.5/59 | Rastpur | 26.51447 | 80.139648 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 300/14 | Rastpur | 26.51447 | 80.139648 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.026 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 7.95 | |
| 2 | HDPE | 75 | 1.47 | |
| 3 | HDPE | 90 | 0.584 | |
| 4 | HDPE | 110 | 0.495 | |
| 5 | HDPE | 125 | 0.448 | |
| 6 | HDPE | 140 | 0.000 | |
| 7 | HDPE | 160 | 0.407 | |
| 8 | HDPE | 180 | 0.018 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 897 |