Project Completion Certificate (Ground Water)
Scheme ID: 20031488 Name of Scheme: RASEED PATTI GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2460 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 14-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.00/78.30 RASEEDPATTI 26.661125 81.681849
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 500LPM / 44Mtr RASEEDPATTI 26.661125 81.681849
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 RASEEDPATTI 26.661075 81.681703
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.0422
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.0000
2 HDPE Pipe PN-6: Class PE-100 180 0.000
3 HDPE Pipe PN-6: Class PE-100 160 0.0314
4 HDPE Pipe PN-6: Class PE-100 140 0.2918
5 HDPE Pipe PN-6: Class PE-100 125 0.000
6 HDPE Pipe PN-6: Class PE-100 110 1.1153
7 HDPE Pipe PN-6: Class PE-100 90 0.4714
8 HDPE Pipe PN-6: Class PE-100 75 0.1605
9 HDPE Pipe PN-6: Class PE-100 63 3.8780
HSC Connection
Sno. Total Nos.
1 377
Other Details
1.55
0.00
1.87
14-Jan-2025
01-Feb-2025