| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20031490 | Name of Scheme: BIHARA GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 4020 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 12-Oct-2023 | Actual Date of Completion (Capex): 30-Nov-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24.00 / 126.30 | Bihara | 26.611251 | 81.70416 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP | 850LPM / 46Mtr | Bihara | 26.611251 | 81.70416 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | oht | 250/14 | Bihara | 26.611264 | 81.703981 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 125 | 0.0248 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 200 | 0.0000 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 180 | 0.0000 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 160 | 0.3591 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 140 | 1.7295 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 125 | 0.0000 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.5072 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 90 | 3.3343 | |
| 8 | HDPE Pipe PN-6: Class PE-100 | 75 | 1.0348 | |
| 9 | HDPE Pipe PN-6: Class PE-100 | 63 | 14.3742 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 845 |