Project Completion Certificate (Ground Water)
Scheme ID: 20031498 Name of Scheme: BARTARA & MOHAMMADPUR DAUDPUR GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 6
Total Population Covered: 4000 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 19-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.01/91.01 Bartara 26.770462 81.638183
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 830LPM/46 Mtr Bartara 26.770462 81.638183
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/14 Bartara 26.770321 81.638004
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 125 0.0228
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE -100 200 2.06
2 HDPE Pipe PN-6: Class PE -100 180 0.0000
3 HDPE Pipe PN-6: Class PE -100 160 0.57
4 HDPE Pipe PN-6: Class PE -100 140 0.75
5 HDPE Pipe PN-6: Class PE -100 125 0.0000
6 HDPE Pipe PN-6: Class PE -100 110 1.37
7 HDPE Pipe PN-6: Class PE -100 90 1.21
8 HDPE Pipe PN-6: Class PE -100 75 0.82
9 HDPE Pipe PN-6: Class PE -100 63 9.57
HSC Connection
Sno. Total Nos.
1 737
Other Details
3.19
0.00
3.85
19-Oct-2023
15-Nov-2024