| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20031498 | Name of Scheme: BARTARA & MOHAMMADPUR DAUDPUR GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 6 |
| Total Population Covered: 4000 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 12-Oct-2023 | Actual Date of Completion (Capex): 19-Oct-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.01/91.01 | Bartara | 26.770462 | 81.638183 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 830LPM/46 Mtr | Bartara | 26.770462 | 81.638183 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250/14 | Bartara | 26.770321 | 81.638004 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 125 | 0.0228 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE -100 | 200 | 2.06 | |
| 2 | HDPE Pipe PN-6: Class PE -100 | 180 | 0.0000 | |
| 3 | HDPE Pipe PN-6: Class PE -100 | 160 | 0.57 | |
| 4 | HDPE Pipe PN-6: Class PE -100 | 140 | 0.75 | |
| 5 | HDPE Pipe PN-6: Class PE -100 | 125 | 0.0000 | |
| 6 | HDPE Pipe PN-6: Class PE -100 | 110 | 1.37 | |
| 7 | HDPE Pipe PN-6: Class PE -100 | 90 | 1.21 | |
| 8 | HDPE Pipe PN-6: Class PE -100 | 75 | 0.82 | |
| 9 | HDPE Pipe PN-6: Class PE -100 | 63 | 9.57 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 737 |