| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20031790 | Name of Scheme: SANOTA - PINAI - KUNDA | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 6832 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 05-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 59.65 Mtr / 81.26 Mtr | SANOTA-PINAI-KUNDA | 29.135803 | 77.842517 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 1450 LPM / 56 Mtr | SANOTA-PINAI-KUNDA | 29.135803 | 77.842517 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 425 Kl / 18 M | SANOTA-PINAI-KUNDA | 29.135803 | 77.842517 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 200 | 0.0336 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8.133 | |
| 2 | HDPE | 90 | 1.257 | |
| 3 | HDPE | 110 | 0.220 | |
| 4 | HDPE | 125 | 1.550 | |
| 5 | HDPE | 140 | 0.4005 | |
| 6 | HDPE | 160 | 1.525 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1174 |