Project Completion Certificate (Ground Water)
Scheme ID: 20031790 Name of Scheme: SANOTA - PINAI - KUNDA No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 6832 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 05-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 59.65 Mtr / 81.26 Mtr SANOTA-PINAI-KUNDA 29.135803 77.842517
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1450 LPM / 56 Mtr SANOTA-PINAI-KUNDA 29.135803 77.842517
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 425 Kl / 18 M SANOTA-PINAI-KUNDA 29.135803 77.842517
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0336
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.133
2 HDPE 90 1.257
3 HDPE 110 0.220
4 HDPE 125 1.550
5 HDPE 140 0.4005
6 HDPE 160 1.525
HSC Connection
Sno. Total Nos.
1 1174
Other Details
5.19
5.19
4.22
22-Jan-2025
23-Jan-2025