Project Completion Certificate (Ground Water)
Scheme ID: 20031795 Name of Scheme: GAGSONA - NAGORI No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 4590 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 15-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 36.36 Mtr / 101.84 Mtr GAGSONA . NAGORI 29.216331 77.863339
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 950 LPM / 54 Mtr GAGSONA . NAGORI 29.216331 77.863339
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 Kl / 16 M GAGSONA . NAGORI 29.216331 77.863339
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0314
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.611
2 HDPE 90 1.3866
3 HDPE 110 0.328
4 HDPE 125 0.070
5 HDPE 140 1.8009
6 HDPE 160 0.7246
HSC Connection
Sno. Total Nos.
1 930
Other Details
4.09
4.09
3.31
03-Feb-2025
04-Feb-2025