Project Completion Certificate (Ground Water)
Scheme ID: 20032097 Name of Scheme: PARASPUR No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 5510 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Apr-2023 Actual Date of Completion (Capex): 01-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 31Mtr/ 118.8Mtr PARASPUR 27.345035 80.257232
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.2 M³ per Min /45Mtr PARASPUR 27.345035 80.257232
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350KL/ 16Mtr PARASPUR 27.345048 80.257232
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.01608
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 5.759
2 HDPE Pipe PN-6, Class PE-100 75 5.393
3 HDPE Pipe PN-6, Class PE-100 90 3.570
4 HDPE Pipe PN-6, Class PE-100 110 6.334
5 HDPE Pipe PN-6, Class PE-100 125 2.592
6 HDPE Pipe PN-6, Class PE-100 140 0.291
7 HDPE Pipe PN-6, Class PE-100 200 0.030
HSC Connection
Sno. Total Nos.
1 467
Other Details
3.75
0.00
3.48
01-Mar-2024
24-Dec-2024