| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20032839 | Name of Scheme: KHIMOTIYA BAKHTI GP W/S SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1606 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 09-Oct-2023 | Actual Date of Completion (Capex): 27-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18/102.28 | Khimotiya Bakhti | 28.897726 | 79.124278 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | AC PUMP | 25.8 | Khimotiya Bakhti | 28.897726 | 79.124278 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zn-Alm | 125/12 | Khimotiya Bakhti | 28.897726 | 79.124278 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.998 | |
| 2 | HDPE | 75 | .360 | |
| 3 | HDPE | 90 | .186 | |
| 4 | HDPE | 110 | .147 | |
| 5 | HDPE | 125 | .06 | |
| 6 | HDPE | 140 | .113 | |
| 7 | DI K7 | 100 | .016 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 311 |