Project Completion Certificate (Ground Water)
Scheme ID: 20032839 Name of Scheme: KHIMOTIYA BAKHTI GP W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1606 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 09-Oct-2023 Actual Date of Completion (Capex): 27-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/102.28 Khimotiya Bakhti 28.897726 79.124278
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC PUMP 25.8 Khimotiya Bakhti 28.897726 79.124278
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zn-Alm 125/12 Khimotiya Bakhti 28.897726 79.124278
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.998
2 HDPE 75 .360
3 HDPE 90 .186
4 HDPE 110 .147
5 HDPE 125 .06
6 HDPE 140 .113
7 DI K7 100 .016
HSC Connection
Sno. Total Nos.
1 311
Other Details
1.38
0.00
1.38
25-Jul-2024
28-Jul-2024