| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20032906 | Name of Scheme: SULTANIPUR GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME | No. of Villages: 5 | No. of Habitation Covered: 8 |
| Total Population Covered: 2880 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Nov-2023 | Actual Date of Completion (Capex): 25-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Plain Pipe (m) | 97.96 | TW | 25.913577 | 83.355917 |
| 2 | Strainer (m) | 15.04 | TW | 25.913577 | 83.355917 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 400/250 | PH | 25.913696 | 83.355846 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zinc Tank | 175/12 | OHT | 25.913709 | 83.35581 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K7 | 125 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN6 PE100 | 63 | 11998 | |
| 2 | HDPE PN6 PE100 | 75 | 447 | |
| 3 | HDPE PN6 PE100 | 90 | 558 | |
| 4 | HDPE PN6 PE100 | 110 | 1331 | |
| 5 | HDPE PN6 PE100 | 140 | 348 | |
| 6 | HDPE PN6 PE100 | 160 | 161 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 427 |