Project Completion Certificate (Ground Water)
Scheme ID: 20033494 Name of Scheme: Mundiya Aas No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2310 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Sep-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.00/75.05 MUNDIYA AAS 27.763948 79.708009
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 30.60/41 MUNDIYA AAS 27.763948 79.708009
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150/12 MUNDIYA AAS 27.764015 79.708016
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.0295
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 3.913
2 HDPE / 6KG 75 0.251
3 HDPE / 6KG 90 0.298
4 HDPE / 6KG 110 0.858
5 HDPE / 6KG 140 0.793
6 HDPE / 6KG 160 0.040
HSC Connection
Sno. Total Nos.
1 406
Other Details
1.84
0.00
1.83
30-Dec-2023
06-Dec-2024