Project Completion Certificate (Ground Water)
Scheme ID: 20033686 Name of Scheme: Patti Fazlabad GP W/S Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1901 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 01-Feb-2024 Actual Date of Completion (Capex): 31-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 17 / 100.42 Patti Fazalabad 28.624117 78.939044
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 7.5 HP Submersible Pump 25.8 / 40 Patti Fazalabad 28.624117 78.939044
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 125 / 12 Patti Fazalabad 28.624342 78.939214
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.0209
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.776
2 HDPE Pipe PN-6: Class PE-100 75 0.304
3 HDPE Pipe PN-6: Class PE-100 63 2.261
4 HDPE Pipe PN-6: Class PE-100 110 0.170
5 HDPE Pipe PN-6: Class PE-100 140 0.321
6 HDPE Pipe PN-6: Class PE-100 160 0.325
HSC Connection
Sno. Total Nos.
1 339
Other Details
1.29
1.52
1.52
31-Aug-2024
01-Sep-2024