| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20033756 | Name of Scheme: ASHARFABAD WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 4220 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 21-Oct-2023 | Actual Date of Completion (Capex): 30-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of Tubewell assembly | 24/85.3 | Asharfabad | 26.341741 | 82.531766 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | AC submersible pumping 15 HP | 850 | Asharfabad | 26.341 | 82.531 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 250/16 | Asharfabad | 26.34 | 82.53 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 150 | 0.035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 75 | 0.341 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 90 | 1.832 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 110 | 2.500 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 140 | 1.759 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 160 | 0.476 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 63 | 17.685 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 740 |