Project Completion Certificate (Ground Water)
Scheme ID: 20033756 Name of Scheme: ASHARFABAD WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 4220 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 30-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell assembly 24/85.3 Asharfabad 26.341741 82.531766
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC submersible pumping 15 HP 850 Asharfabad 26.341 82.531
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 250/16 Asharfabad 26.34 82.53
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 75 0.341
2 HDPE Pipe PN-6: Class PE-100 90 1.832
3 HDPE Pipe PN-6: Class PE-100 110 2.500
4 HDPE Pipe PN-6: Class PE-100 140 1.759
5 HDPE Pipe PN-6: Class PE-100 160 0.476
6 HDPE Pipe PN-6: Class PE-100 63 17.685
HSC Connection
Sno. Total Nos.
1 740
Other Details
2.97
3.17
3.17
30-Sep-2024
01-Oct-2024