| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20033782 | Name of Scheme: SALEMPUR NABAL SINGH PWS | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 1800 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 20-Jun-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 18.15/95.5 | SALEMPUR NABAL SINGH | 26.499714 | 79.519944 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 30.9/53 | SALEMPUR NABAL SINGH | 26.499714 | 79.519944 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT's | 150/16 | SALEMPUR NABAL SINGH | 26.499575 | 79.519921 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 100 | 17.00 |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3312.60 | |
| 2 | HDPE | 75 | 139 | |
| 3 | HDPE | 90 | 2271 | |
| 4 | HDPE | 110 | 440 | |
| 5 | HDPE | 140 | 378 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 482 |