Project Completion Certificate (Ground Water)
Scheme ID: 20033813 Name of Scheme: KATUAI water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 14
Total Population Covered: 4980 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 06-Oct-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well assembly 93.82/29 Katuai 26.43565549 82.6407055
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC submersible pump 63.25/49 Katuai 26.43565547 82.6407053
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 300/18 Katuai 26.43565551 82.6407057
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 90mm dia HDPE Pipe 90 0.46
2 75mm dia HDPE Pipe 75 0.18
3 63mm dia HDPE Pipe 63 16.93
4 110mm dia HDPE Pipe 110 1.80
5 140mm dia HDPE Pipe 140 1.53
6 160mm dia HDPE Pipe 160 2.24
7 200mm dia HDPE Pipe 200 2.15
HSC Connection
Sno. Total Nos.
1 656
Other Details
3.72
3.74
3.74
06-Oct-2026
07-Oct-2026