Project Completion Certificate (Ground Water)
Scheme ID: 20033820 Name of Scheme: Madarpur Water supply scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2650 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 05-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 24.03/106.82 Madarpur 26.573558 82.526848
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 12.5 HP 600 LPM/ 43 Mtr. Madarpur 26.573558 82.526848
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 175/12 Madarpur 26.5735 82.5267
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 160 .0953
2 HDPE Pipe PN-6: Class PE-100 140 1.146
3 HDPE Pipe PN-6: Class PE-100 125 .1155
4 HDPE Pipe PN-6: Class PE-100 90 1.0966
5 HDPE Pipe PN-6: Class PE-100 75 .7582
6 HDPE Pipe PN-6: Class PE-100 63 5.552
HSC Connection
Sno. Total Nos.
1 398
Other Details
1.95
1.95
1.89
07-Dec-2024
08-Dec-2024