Project Completion Certificate (Ground Water)
Scheme ID: 20033825 Name of Scheme: RAMPUR SAKARWARI WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 13
Total Population Covered: 5088 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 09-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of tubewell assembly 20/80.3 RAMPUR SAKAARWARI 26.35174 82.50472
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 ACsubmersible pumping 12.5HP 1050/46 RAMPUR SAKAARWARI 26.35167 82.50476
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 300/16 RAMPUR SARKARWARI 26.35167 82.50476
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K-7 200 35
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 75 0.446
2 HDPE Pipe PN-6: Class PE-100 110 1.209
3 HDPE Pipe PN-6: Class PE-100 140 0.534
4 HDPE Pipe PN-6: Class PE-100 160 1.429
5 HDPE Pipe PN-6: Class PE-100 200 0.810
6 HDPE Pipe PN-6: Class PE-100 90 1.736
7 HDPE Pipe PN-6: Class PE-100 63 23.185
HSC Connection
Sno. Total Nos.
1 928
Other Details
3.82
3.69
3.69
09-Apr-2025
10-Apr-2025